Level 2Ampaway Dual-Port Wall ChargerTwo connectors · RFID access · NetworkedSingle-Port Wall MountGarages, homes & workplacesPedestal ChargerSurface lots & curbside parkingMulti-Unit Garage RolloutLoad-managed circuits for many stallsView Level 2 EV Charging →
DC FastAmpaway High-Power DispenserUp to 400 kW · CCS1 + NACSAmpaway DC WallboxCompact wall-mount DC · Dual connectorDual-Cable DC Fast ChargerTouchscreen · Tap to payDC Fast Charging HubMulti-stall sites with canopyView Level 3 DC Fast Charging →
InfrastructureSwitchgear & MeteringService equipment, meters & disconnectsTrenching & ConduitBoring, trenching & underground runsEquipment Pads & CabinetsConcrete pads, cabinets & settingBollards & Site ProtectionCore drilling, bollards & wheel stopsView EV Infrastructure →
Solar CarportsT-Frame Solar CanopySingle-column canopy over two rowsRooftop Garage CarportTop-deck canopies with chargersCanopy + Charging HubIntegrated cabinets & dispensersGround-Mount SolarFixed-tilt arrays beside your siteView Solar Carports →
Energy StorageContainerized Battery (BESS)Peak shaving & backup for charging sitesBattery-Buffered ChargingFast charging on limited grid serviceSolar + Storage + ChargingGenerate, store and deliver on siteView Battery Storage & Power Banks →
Multifamily & FleetApartment Garage ChargingAssigned & shared resident stallsCorridor & Wall InstallsClean conduit runs in occupied buildingsFleet Depot ChargingOvernight & opportunity chargingView Multifamily & Fleet Charging →
ContactGet a Quote(888) 490-0090

EV Infrastructure

Utility service, switchgear, trenching and site work — the power behind every charger

EV Infrastructure

What’s included

EV Infrastructure, done right.

Every charging site lives or dies on its infrastructure. We build the electrical and civil backbone — from the utility connection to the last conduit stub — so chargers go in now and expand later without tearing up the site.

  • Utility service applications, coordination and energization
  • Pad-mounted transformers and concrete vaults
  • Switchboards, panelboards, meters and disconnects
  • Directional boring, trenching and underground conduit
  • Equipment pads, cabinets and setting
  • Core drilling, bollards and site protection
  • Make-ready and EV-ready conduit for future expansion
  • Carport and canopy foundations

No cost · No obligation

Get a Free Site Assessment

Tell us about your property and charging goals. We’ll review power, equipment options, incentives and timeline — no cost, no obligation.

Prefer to talk? (888) 490-0090

It is printed at the top of your electric bill. This decides which rebates apply.
A best guess is fine.
Lets us check your utility territory, disadvantaged-community status and permit jurisdiction before we call.
Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.
Upload a photo (or a few photos) of the parking spots where you'd like the chargers installed. Up to 20 images.