EV Charging Incentives

Incentives · Los Angeles area

Get paid back for installing EV charging.

Utilities, the State of California and the carbon-credit market all pay property owners to add chargers. Pick where you’re installing and who your utility is, and we’ll show you which programs apply, what qualifies, and how the money comes back to you.

Program details last verified October 23, 2026
$1,500Typical top rebate for a home Level 2 charger (LADWP, Burbank)
$125,000Per DC fast charger, LADWP commercial program (disadvantaged community)
$100,000Per port, CALeVIP Fast Charge California, 275 kW+ public sites
Cost estimator

What will it cost to install?

Planning ranges for the Los Angeles area, built from 2026 installed-cost data and our own project history. Pick the project, set the size, and see where the money goes before any incentives come off.

charging ports
kWh
spaces (about 6 kW of solar each)
Planning range · before incentives
$1,400 – $3,200
After typical incentives
    Get an exact quote for this
    Step 1

    Find your programs

    Two questions. The cards below update as you choose.

    City of Los Angeles (Hollywood, the Valley, Venice, San Pedro, Wilmington) → LADWP.  Burbank, Glendale, Pasadena → their own city utility.  Everything else in LA County (Long Beach, Santa Monica, Beverly Hills, the South Bay, the Gateway cities, the San Gabriel Valley) → SCE. The utility name is printed at the top of your bill. Choose one above and the cards will update.
    What you could qualify for
    Up to $1,500
    LADWP Charge Up LA! home rebate, plus a reduced overnight charging rate.

    Step 2

    How an incentive actually works

    Most of the money arrives after the install, as a rebate check or bill credit. The programs that pay the most also require you to apply before you buy anything. That timing is the single most common way people lose a rebate.

    BEFORE INSTALL

    Reserve the money

    Confirm your utility, check whether the address is in a disadvantaged community (higher amounts), and submit the application where pre-approval is required.

    Pre-approval required: SCE Charge Ready, SCE Charge Ready Home, LADWP Commercial, CALeVIP. Apply first, buy second.
    DURING INSTALL

    Build to the rules

    Licensed C-10 electrician, pulled permit, approved charger from the program's equipment list, inspection sign-off. Keep every invoice and take photos of the installed unit and its label.

    AFTER INSTALL

    Submit the package

    Paid invoice, charger receipt with model number, finalized permit, photos, utility account number. Home programs like LADWP, BWP, GWP and PWP accept this after the fact.

    Deadlines: BWP wants applications within 4 months of purchase; most others within 6 months.
    PAYMENT

    Get paid

    Residential rebates typically arrive as a check in 6–12 weeks. LADWP commercial rebates can take up to 12 months after the final documents are received, so plan cash flow around that.

    Ongoing · every month

    Cheaper electricity for charging

    Every LA-area utility offers a time-of-use EV rate. Charge overnight and the per-kWh price drops sharply. BWP and LADWP enroll rebate recipients automatically for at least a year.

    Ongoing · for commercial sites

    Carbon credits (LCFS)

    California's Low Carbon Fuel Standard issues tradable credits for every kWh a charger dispenses. Fast chargers of 50 kW or more can also earn capacity-based credits for up to 10 years, whether or not anyone plugs in. A credit aggregator sells them and remits most of the revenue to the site owner.

    Step 3

    The programs

    Filtered to your selection above. Amounts are the program's published maximums; what you receive depends on your project cost, location and funding left in the cycle.

    Home charging
    LADWP · ResidentialOpen

    Charge Up LA! Home Rebate

    Up to $1,500$1,000 charger + install · +$250 dedicated EV meter · +$500 Lifeline / EZ-SAVE customers

    Covers up to 100% of project cost for a new Level 2 charger from LADWP's approved list, including the electrical work. Apply after installation.

    Level 2, 240 VJ1772 or J3400ENERGY STAR listPermit + photos
    LADWP program page ↗
    SCE · ResidentialOpen · pre-approval

    Charge Ready Home

    Up to $4,200Panel / wiring upgrade · $4,200 income-qualified · $2,100 if located in a disadvantaged community

    Pays for the electrical side (panel upgrade, circuit) that makes home charging possible. The charger itself is not covered. Must be approved before work starts.

    Panel < 200 AIncome or DACApply first
    SCE program page ↗
    Burbank Water & PowerOpen

    Residential EV Charging Rebate

    Up to $1,500Charger rebate + up to $750 panel upgrade · higher tier in disadvantaged areas

    Up to two charging stations per home. Renters are eligible. Rebate recipients are placed on the EV time-of-use rate for one year.

    Level 2, 3.3 kW+Renters OKApply within 4 mo.
    BWP program page ↗
    Glendale Water & PowerOpen

    Residential Charging Station Rebate

    Up to $1,399$599 charger, install and permit fees · up to $800 for a panel upgrade

    Reimburses out-of-pocket costs for a Level 2 home charger, including permit fees. Apply after installation with receipts.

    Level 2, 240 VPermit fees count
    GWP program page ↗
    Pasadena Water & PowerOpen

    Residential Charger Incentive

    Up to $600$600 Wi-Fi enabled charger · $200 standard charger · charger cost only

    Covers the charger hardware. Installation and permit costs are not included, so pair it with the EV time-of-use rate for ongoing savings.

    Level 2, 240 VWi-Fi pays 3×
    PWP program page ↗
    Multifamily, workplace & commercial
    LADWP · CommercialNext cycle pending

    Commercial EV Charger Rebate · Level 2

    Up to $5,000 / chargerIn a disadvantaged community · lower tier elsewhere · up to 80 chargers per site

    For apartment buildings, shopping centers and workplaces. Rebate per parking space served. $45 million allocated for Level 2 in the July 2026–June 2027 fiscal year; enrollment opens in short windows, so get the application ready now.

    6.2 kW+ outputNetworkedNRTL / UL listedApply before purchase
    LADWP commercial program ↗
    LADWP · CommercialNext cycle pending

    Commercial EV Charger Rebate · DC Fast

    Up to $125,000 / charger150 kW+ in a disadvantaged community · tiers from $35,000 at 24 kW · $2 million cap per site

    Up to 20 fast chargers per site when public access is 18 hours a day. $20 million allocated for DC fast charging this fiscal year. Also covers medium- and heavy-duty fleet chargers.

    50 kW+ per connectorCCS / J3400Public 18 hr/dayPayment up to 12 mo.
    LADWP funding dashboard ↗
    SCE · CommercialOpen · pre-approval

    Charge Ready · Small Site Rebate

    Up to $10,000 / portUp to 4 Level 2 ports · $40,000 per site · rebate covers chargers and part of the infrastructure

    The fast path for a property adding a few chargers. Sites with 4 or more ports can instead use the full Charge Ready program, where SCE builds the utility-side and customer-side infrastructure at no or low cost.

    SCE approved list10-year operationDemand responseApply first
    SCE Charge Ready ↗
    SCE · FleetsOpen

    Charge Ready Transport

    Infrastructure at low or no cost+ equipment rebate up to 50% for transit agencies and non-Fortune-1000 businesses in disadvantaged communities

    For medium- and heavy-duty fleets. SCE designs and builds the make-ready infrastructure to the charger; you select and install the chargers.

    MD / HD fleetsMake-ready
    Charge Ready Transport ↗
    Burbank Water & PowerOpen

    Commercial EV Charging Station Rebate

    Up to $7,500 / Level 2Up to $20,000 per DC fast charger · higher amounts in disadvantaged communities

    For businesses and multifamily owners installing for tenants. Multifamily owners apply here, not through the residential program.

    Level 2 + DCFCMultifamily
    BWP EV programs ↗
    Glendale Water & PowerOpen

    Commercial Charging Station Rebate

    Up to $6,000 / chargerProject cap: the lesser of $50,000 or 50% of total cost

    Commercial and multifamily customers. Reimburses charger, installation and permit fees for Level 2 and DC fast equipment.

    Level 2 + DCFC50% of cost
    GWP program page ↗
    Pasadena Water & PowerOpen

    Commercial Charger Incentive

    Up to $6,000 / port$3,000 per smart Level 2 port · doubled in disadvantaged areas · $1,500 for non-networked

    Workplaces, multi-unit dwellings and fleets. Each port of a multi-port charger counts if it can deliver full power to every car at once.

    Networked pays 2×Per port
    PWP program page ↗
    State · CEC / CALeVIPWindow open Oct 7 – Jan 14

    Fast Charge California Project

    Up to $100,000 / port$55,000 per port at 150–274 kW · $100,000 at 275 kW+ · 4 to 20 ports per site

    Statewide, for publicly accessible DC fast charging. First-come, first-served and ready-to-build only: you need the final utility service design and issued permit in hand. Disadvantaged and low-income communities get priority. A second window runs Feb 24 – May 27, 2027.

    Public accessReady-to-buildCCS + J3400Stacks with utility rebates
    CALeVIP ↗
    State · CEC / CALSTARTWave 5 coming

    Communities in Charge

    Per-port Level 2 rebatesBonus tiers for multifamily, affordable housing, tribal and disadvantaged-community sites

    California's statewide Level 1 and Level 2 program, focused on apartment buildings and the places communities gather. Wave 4 closed in January 2026 with $56.5 million; the next wave is announced but not yet dated.

    Multifamily focusL1 + L2
    Communities in Charge ↗
    State · CARB · LCFSOngoing revenue

    Low Carbon Fuel Standard credits

    Paid per kWh, every quarterPlus capacity-based credits for 50 kW+ fast chargers, up to 10 years

    Not a rebate: a recurring revenue stream for as long as the chargers operate. Site owners typically sign with an aggregator who reports the data to CARB, sells the credits and remits most of the proceeds.

    Metered chargersQuarterly reporting
    No longer available
    Federal · IRS §30CEnded June 30, 2026

    Federal EV Charger Tax Credit

    30% / $1,000 home · $100,000 businessNo longer available for chargers placed in service after June 30, 2026

    Shown here so you don't plan around it. Chargers that were operating by June 30, 2026 can still be claimed on Form 8911. New projects should budget without it.

    IRS Form 8911 instructions ↗
    No matching program for that combination yet. State programs (CALeVIP, Communities in Charge, LCFS) are shown when they apply. Call us and we'll check the current cycle for your address.
    Step 4

    Which chargers qualify

    Programs don't fund "a charger." They fund a specific kind of charger, installed a specific way. These are the requirements that show up again and again.

    Usually required

    • ✓
      Level 2, 240-volt, hardwiredMost home and commercial programs. For DC fast, a minimum guaranteed output per connector (LADWP: 50 kW; CALeVIP: 150 kW).
    • ✓
      Standard connectorSAE J1772 or J3400 (the Tesla/NACS plug). For fast chargers, CCS and J3400; LADWP requires at least half the connectors be CCS.
    • ✓
      Safety listedCertified by a nationally recognized testing laboratory (UL, ETL, CSA). Every program checks this.
    • ✓
      On the program's equipment listLADWP uses ENERGY STAR; SCE and CALeVIP keep their own approved-product lists. Buying off-list is the second most common way to lose a rebate.
    • ✓
      Networked / smartRequired for nearly all commercial rebates and for LCFS credits. Pasadena pays twice as much for a Wi-Fi charger even at home.
    • ✓
      Licensed install, pulled permit, passed inspectionC-10 electrical contractor. The signed-off permit is part of your application package.
    • ✓
      New equipmentPurchase rebates are for new, unused chargers only.

    Usually not eligible

    • ✕
      A 14-50 outlet onlyPlug-in configurations without a mounted charger don't qualify for LADWP commercial rebates.
    • ✕
      Portable or Level 1 cordsThe cable that came with the car isn't a rebate item.
    • ✕
      Unpermitted workNo final permit, no rebate.
    • ✕
      Golf carts, scooters, e-bikesPrograms are for on-road plug-in vehicles.
    • ✕
      Utility transformer depositsExcluded from eligible costs in most commercial programs.
    • ✕
      Equipment bought before approvalWhere pre-approval is required, anything purchased first is ineligible.
    Step 5

    How the money stacks

    Three illustrative projects. Rebates reduce what you pay; the ongoing lines are what the chargers earn back afterward.

    Example A · Home

    Burbank homeowner, one Level 2 charger with a panel upgrade

    Installed cost$3,200
    BWP charger rebate−$500
    BWP panel upgrade rebate−$750
    Net cost$1,950
    Ongoing: EV time-of-use ratelower kWh
    ILLUSTRATIVE · AMOUNTS VARY
    Example B · Multifamily

    Los Angeles apartment building, 10 networked Level 2 chargers in a disadvantaged community

    Installed cost$85,000
    LADWP commercial rebate, 10 × $5,000−$50,000
    Net cost$35,000
    Ongoing: LCFS credits + charging feesquarterly
    ILLUSTRATIVE · AMOUNTS VARY
    Example C · Public fast charging

    Retail site in LADWP territory, 4 × 150 kW public DC fast chargers

    Installed cost$640,000
    CALeVIP Fast Charge CA, 4 × $55,000−$220,000
    LADWP DCFC rebate (DAC tier)up to −$500,000
    Net costcost-capped
    Ongoing: LCFS capacity credits, 10 yrquarterly
    ILLUSTRATIVE · STACKED REBATES CANNOT EXCEED PROJECT COST
    Common questions

    The things people ask us

    Can I combine a utility rebate with a state rebate?
    Usually yes. CALeVIP explicitly allows stacking with utility programs, as long as the total of all incentives doesn't exceed your eligible project cost. You cannot stack two California Energy Commission programs on the same address, and most programs won't pay for costs another program already covered.
    What is a "disadvantaged community" and why does it pay more?
    It's a census tract flagged by CalEPA's CalEnviroScreen tool for pollution burden and economic factors. Large parts of the San Fernando Valley, South LA, the Eastside and the Harbor area qualify. LADWP, Burbank, Glendale, Pasadena and CALeVIP all raise their caps or priority for these addresses. We check the map for every site we assess.
    I'm a renter. Can I get anything?
    Burbank's residential program accepts renters directly. Elsewhere, the rebate goes to the utility account holder, so ask your landlord to apply, or point them to the multifamily programs above, which pay the building owner far more per charger than a home rebate would.
    Why did the federal tax credit disappear?
    The 2025 federal budget law moved the end date of the §30C charger credit from 2032 to June 30, 2026. Chargers placed in service by that date can still be claimed on Form 8911. Nothing installed after it qualifies. Utility and state programs were never tied to it and continue.
    How long does the whole thing take?
    A home install with an after-the-fact rebate: 2–6 weeks for the work and permit, then 6–12 weeks for the check. A commercial project with pre-approval: expect 2–4 months to secure the reservation and utility design before construction, and up to 12 months after completion for LADWP to pay. We build the timeline into the project schedule so nothing expires.
    About this information

    Incentives change. Here's how we handle that.

    1. These programs are not ours. They are run by LADWP, Southern California Edison, the cities of Burbank, Glendale and Pasadena, the California Energy Commission and the California Air Resources Board. EHT Construction does not set amounts, approve applications or issue payments.
    2. Funding runs out. Most programs are first-come, first-served within a fiscal year or an application window. A rebate listed as "open" today can be fully subscribed next week.
    3. Amounts are maximums. Your rebate is capped at your actual eligible cost and depends on charger output, location, income tier and remaining funds.
    4. We verify before every project. This page is reviewed quarterly, and we confirm the live program terms for your specific address before you sign anything with us. Where the program has changed, the program wins, not this page.
    5. This is not tax, legal or financial advice. Talk to your tax professional about how a rebate or credit affects your return.
    LAST VERIFIED 2026-10-23NEXT REVIEW 2027-01SOURCES: PROGRAM PAGES LINKED ON EACH CARD

    Free incentive check for your address

    Tell us where the chargers go. We'll confirm your utility, check the disadvantaged-community map, pull the current program terms and tell you what the install will really cost after rebates.